What we found
355 Court Street’s cornice had been declining gradually but visibly for several years. Rust streaks running down the brownstone below, paint cracking at the seams, a couple of decorative elements with their original detail softening. The building was on a high-traffic block — visibility mattered.
Court Street cornice after restoration.
The Work
Standard cornice rehab sequence: scrape failed paint and surface rust, treat penetrating rust, solder where the metal had thinned, patch where decorative elements had loosened, prime, and finish in two color-matched coats. Carroll Gardens has its own color tradition — a slightly warmer brownstone tone than Park Slope or Bed-Stuy — and the finish was matched accordingly.
The result
Cornice restored cleanly. Rust streaking stopped at the source. Visible character of the building improved meaningfully from the sidewalk view.
Project gallery
A few additional views of the work at 355 Court Street.
Court Street cornice after restoration.
Decorative element detail with restored profile.
Cornice in context with surrounding facade.
Want to walk to this project?
355 Court Street is a real address. We can meet you there for a walkaround, point out the specific repair work, and answer questions in person. Or we can send you photos of the precise details. Just call Sajin at 631-464-8200.